|
Freightliner
- Ground up facility
- 4 major building facilities including storage, training, body shop, sales
- 4" Natural gas piping system
- Pneumatic air piping system
- Condensation drain system
- Chilled evaporation system
- 4" domestic water piping system
- 6" sanitary drain, waste, and vent system
- ADA roll in showers
- Floor sinks, trench drains, and floor drains
- Final connections to plumbing fixtures
|